How we calculate

PlanHome’s calculators use two kinds of figures: rules, read from official government sources, and cost ranges, taken from published Australian cost guides. We do not survey builders and we do not take money to change a figure. Every number on a calculator page can be traced to a source listed here.

Rules

Each state’s rules come from the legislation or the state planning department’s own guidance. We record the date we last read each source and show it on the page. Rules last checked: 8 November 2026.

A calculator checks the headline state rules only. Zones, overlays (heritage, bushfire, flood, landslip), council planning schemes, covenants and easements can change the answer for a particular block.

Costs

Cost ranges come from these published 2026 guides, last read on 8 November 2026:

For each item we take the low end and the high end of the published ranges, and a typical figure in between. All figures include GST. A 10% contingency is added to the total, because the sources recommend 10 to 20%.

Granny flat calculator inputs (low / typical / high)

Build rate per m²: Modular or prefab$2,000 / $2,400 / $3,000
Build rate per m²: Builder, standard design$2,200 / $2,800 / $3,500
Build rate per m²: Custom or architect designed$3,500 / $4,300 / $5,300
Site works and service connections$15,000 / $25,000 / $40,000
Site works and service connections (sloping or hard block)$25,000 / $40,000 / $60,000
Long sewer, water or power run$5,000 / $10,000 / $15,000
Design, approvals and certification (fast path)$3,000 / $6,000 / $12,000
Design, approvals and certification (full application)$4,000 / $10,000 / $18,000
Driveway, paths and landscaping$5,000 / $10,000 / $20,000
Crane and traffic control (modular)$3,000 / $6,000 / $12,000

House build and knockdown rebuild calculator (low / typical / high)

Build rates by type of home are national 2026 figures. Next to the estimate we show what new houses actually cost in your state: the ABS average for 2024-25 (average cost divided by average floor area), brought forward one year with the ABS house construction price index. We do not apply a state adjustment to the estimate itself, because no source publishes one for current quotes. A 10% contingency is added to the build. Sources, read on 8 November 2026:

Build rate per m²: Project home, single storey$2,400 / $2,650 / $2,900
Build rate per m²: Project home, double storey$2,900 / $3,150 / $3,400
Build rate per m²: Custom design$3,300 / $3,600 / $3,900
Design, engineering and approvals$12,000 / $25,000 / $45,000
Soil test, site fencing, temporary power, driveway crossover$9,000 / $14,000 / $22,000
Landscaping, driveway and fencing$18,000 / $35,000 / $65,000
Demolition and site clearing$15,000 / $27,000 / $40,000
Asbestos survey and removal (bonded)$4,000 / $9,000 / $14,000
Disconnect and relocate services$4,000 / $10,000 / $22,000
Moving out and back in$3,000 / $5,000 / $7,000

Extension and second storey calculator (low / typical / high)

Ground floor rates per m² are CO-architecture's 2026 rates by state and finish; typical is the middle of each range. Second storey rates add 30% at the low end and 50% at the high end, as the same source describes. Extensions carry more unknowns, so the contingency is 15% of the build. The quote check compares a quote with the low and high totals. Sources, read on 8 November 2026:

Bathroom fit-out (mid-range)$20,000 / $27,000 / $35,000
Kitchen fit-out (mid-range)$25,000 / $35,000 / $45,000
Remove a load-bearing wall (steel beam, propping)$8,000 / $15,000 / $25,000
New staircase$15,000 / $25,000 / $40,000
Demolish the part being replaced$5,000 / $15,000 / $30,000
Structural engineering$3,000 / $6,000 / $10,000
Design and construction drawings (building designer)$7,000 / $12,000 / $20,000
Approval: CDC or building permit$2,000 / $5,000 / $8,000
Approval: council DA or planning permit, plus building approval$7,000 / $15,000 / $30,000

How the figures stay current

An automatic check re-reads the sources every month. ABS-based figures are updated when the source changes, within a safety limit. Other changes are reviewed by a person before they go live, and sites that block automated reading are checked by hand every quarter. Each calculator page shows the date its figures were last changed.

What the calculators cannot tell you

Found a figure that is out of date? Tell us and we will check it against the source.