CDC vs DA: which approval do you need in NSW?

If your project meets every standard in the state code, you can use a complying development certificate (CDC): a combined planning and construction approval from a private certifier or council in as little as 20 days. If it does not, or your land is excluded, you need a development application (DA) to council, which takes 70 days on average and then a construction certificate before you can build.

CDC and DA side by side

CDC (complying development)DA (development application)
What it isA combined planning and construction approval for straightforward work that meets set standardsA planning approval assessed on its merits by council
Who approvesAn accredited private certifier or councilYour council (larger projects go to a planning panel)
How longAs little as 20 days (10 days for NSW Housing Pattern Book designs)70 days on average, and longer for complex or contested proposals
RulesMust meet every standard in the code (height, setbacks, site coverage, landscaping and more)Can be approved even if it departs from some controls, if council accepts the reasons
NeighboursTold in writing 14 days before approval (metro areas, within 20 m). They cannot make a submissionNotified under council's policy and can make submissions that council must consider
Before buildingThe CDC already covers construction. Appoint a principal certifier and notify neighboursYou also need a construction certificate and a principal certifier
Typical feesAbout $3,000 to $8,000 for the certifierAbout $5,000 to $25,000 or more in council fees and reports

Sources: NSW Planning: complying development; NSW Planning: what to tell your neighbours; City of Sydney: get approval to start building work; fees from CO-architecture: approval costs in its 2026 extension cost guide.

Can you use a CDC? Check these four things

  1. Your work is a type the codes cover, such as a new house, alterations and additions, a granny flat, a pool or demolition.
  2. Your land is not excluded. Heritage items, and some bushfire, flood and environmentally sensitive land, cannot use a CDC. Your planning certificate (section 10.7) says whether complying development is allowed.
  3. Your lot meets the minimums. For a granny flat that is at least 450 m², with 12 m of street frontage on lots up to 900 m².
  4. Your design meets every numeric standard: building height, setbacks, site coverage, landscaped area, privacy and car parking. If one standard fails, it becomes a DA.

Building a granny flat? The granny flat calculator checks your lot size and frontage against the CDC rules, and the NSW granny flat page lists every standard (NSW Housing SEPP (granny flat CDC standards)).

How to get a CDC, step by step

  1. 1

    Check you are eligible

    Order a section 10.7 planning certificate from council and check your zone, lot size and frontage against the code that applies to your work.

  2. 2

    Prepare the drawings and reports

    Site plan, floor plans, elevations and sections to scale, plus the reports your project needs, such as a BASIX certificate, survey and engineering.

  3. 3

    Apply to a certifier or council

    Lodge the CDC application through the NSW Planning Portal. In metro areas, neighbours within 20 m are told in writing 14 days before it can be approved.

  4. 4

    Get the CDC and appoint a principal certifier

    Once the CDC is issued, appoint a principal certifier to inspect the work at set stages.

  5. 5

    Tell the neighbours and council before work starts

    Give neighbours within 20 m written notice at least 7 days before work starts in metro areas (2 days in rural and regional areas), and lodge a notice of commencement at least 2 days before.

  6. 6

    Build, inspect and get the occupation certificate

    The principal certifier inspects at key stages and issues an occupation certificate when the work is finished.

Sources: NSW Planning: what to tell your neighbours; NSW Planning: before you can start work.

The drawings a CDC needs

Certifiers assess a CDC from scaled drawings: a site plan with setbacks, floor plans, elevations and sections. PlanHome draws these from your design and checks them against the granny flat standards as you go.

Common questions

What is the difference between a CDC and a DA?

A complying development certificate (CDC) is a fast combined planning and construction approval for work that meets every standard in a state code, issued by a private certifier or council in as little as 20 days. A development application (DA) is assessed by council on its merits, takes 70 days on average, and is needed when the design does not meet every standard or the land cannot use complying development.

Is a CDC cheaper than a DA?

Usually. Certifier fees for a CDC are about $3,000 to $8,000, while a DA is about $5,000 to $25,000 or more once council fees and reports are added, and a DA also needs a separate construction certificate. NSW Planning says homeowners can save up to $15,000 when building a house through complying development, and up to $2,600 on renovations.

How long does a CDC take in NSW?

As little as 20 days, or 10 days for NSW Housing Pattern Book designs. In metro areas it cannot be approved until neighbours within 20 m have had 14 days' written notice (7 days for Pattern Book designs).

Can my neighbours object to a CDC?

No. Neighbours must be told about the application and again before work starts, but they cannot make a submission against a complying development. The certifier assesses the design against the standards, not against objections.

Can I get a CDC for a granny flat?

Yes, if the lot is in a residential zone other than R5, is at least 450 m², has the required street frontage (12 m on lots up to 900 m²) and the granny flat is no more than 60 m² and meets the setback, height and open space standards in the Housing SEPP.

What happens if my design fails one CDC standard?

It cannot be approved as complying development, so it needs a DA to council. NSW Planning exhibited changes in mid 2026 that would allow some small variations within complying development; until they take effect, every standard must be met.

General information for NSW, not legal or planning advice. Confirm your pathway with a registered certifier or your council. Last updated 8 November 2026.